Incentives for commercial storage

Eligibility is assessed under the rules in force at installation. Principal Energy does not provide tax or financial advice.

A system at this scale is normally a depreciating asset rather than an immediate deduction, and the treatment depends on your circumstances. Your accountant is the right person to confirm it.

NSW · from 1 September 2026OPEN NOW

Peak Demand Reduction Scheme

20–40% off
BESS4
20–200 kWh
BESS5
200 kWh – 30 MWh (incentive on first 10 MWh)

Roughly 20–30% off a battery-only install, or 30–40% when paired with new solar. A single 233 kWh TIANWU unit sits inside BESS5. Batteries have to be internet-connectable and DRA-controllable, which the WHES units are. Three new battery activities commence on 1 September 2026 under the current PDRS Rule.

Scheme
NSW Peak Demand Reduction Scheme, part of the Energy Security Safeguard
Administrator
IPART (Scheme Administrator and Regulator); policy and Rule by NSW DCCEEW
Instrument
PDRS Rule, updated annually
Activities
BESS4 — 20–200 kWh · BESS5 — 200 kWh–30 MWh, incentive on the first 10 MWh
Commences
1 September 2026
Certificate
Peak Reduction Certificate (PRC) = 0.1 kW of peak reduction capacity
Peak window
2:30pm–8:30pm, 1 November – 31 March
Conditions
Battery must be internet-connectable and DRA-controllable
Federal · from 1 October 2026OPENS SOON

SRES expansion

100 kW → 1 MW

Solar PV eligibility lifts from 100 kW to 1 MW, so mid-scale commercial, industrial and agricultural rooftops can create small-scale technology certificates instead of large-scale generation certificates. Announced 5 August 2026, intended to apply to systems installed from 1 October 2026, subject to regulations being in place.

Scheme
Small-scale Renewable Energy Scheme (SRES)
Administrator
Clean Energy Regulator, under the Renewable Energy (Electricity) Act 2000
Change
Solar PV eligibility 100 kW → 1 MW; STCs instead of LGCs
Announced
5 August 2026, Minister for Climate Change and Energy
Applies from
1 October 2026, subject to regulations being in place
Applies to
Solar PV generation capacity, not battery storage
Scheme end
No new certificates after 31 December 2030

Eligibility check

Send the site details and we will confirm which schemes it qualifies under, and at what capacity band.